27 February 2023 to 3 March 2023
Institute for Advanced Study of the Technische Universität München
Europe/Berlin timezone

Session

ML for phase transitions and sign problem mitigation

talks and panel discussion
27 Feb 2023, 16:30
Institute for Advanced Study of the Technische Universität München

Institute for Advanced Study of the Technische Universität München

Lichtenbergstraße 2a 85748 Garching Germany

Conveners

ML for phase transitions and sign problem mitigation: Contour deformation methods for noise reduction

  • Will Detmold

ML for phase transitions and sign problem mitigation

  • Maria-Paola Lombardo

Description

Talks and panel discussion

Presentation materials

There are no materials yet.

  1. Gurtej Kanwar
    27/02/2023, 16:30
  2. Yukari Yamauchi
    27/02/2023, 16:50
  3. Marcel Rodekamp
    27/02/2023, 17:10
  4. Chair: Will Detmold, Members: Gurtej Kanwar, Andrei Alexandru (The George Washington University), Thomas Luu, Yukari Yamauchi
    27/02/2023, 17:30

    1) Is there a way to determine the maximum improvement in <sign> or in S-to-N that is achievable through contour deformations and related
    approaches?

    2) How can ML be targeted towards such a maximal improvement?

    3) Are there features of specific observables that make contour
    deformation particularly effective or ineffective?

    4) How do contour deformations for one observable/theory...

    Go to contribution page
  5. Andrei Alexandru
    28/02/2023, 14:30
  6. Marius Neumann
    28/02/2023, 14:50
  7. Francesco Di Renzo
    28/02/2023, 15:10
  8. Chair: Maria Paola Lombardo
    28/02/2023, 15:30

    Panel discussion addressing the three main questions:

    --Where do we stand with the identification of phases with ML?
    Do you feel ML could become competitive with standard techniques for the quantitative studies of known phase transitions i.e. order of the transition at large Nf, chiral limit, etc.

    --Which are your views on the need/concrete possibility of identifying hypothesised, not...

    Go to contribution page
Building timetable...